7401 Turnbull Court ~ Windsor CO 80550

December 20 2019 - We have painted the interior and finished all the tile work and flooring and also installed all the exterior stone. We are now trimming out for electrical and installing all the light fixtures. We will paint the exterior next week and hopefully pour the concrete patios and porches. December 8 2019 - We have installed the hard surface floors (and are protecting them as you can see in the photo below) of real maple hardwood floor in the great room and kitchen and LVP in the bathrooms, laundry room and basement wet bar areas. We have installed the cabinets and shower wall tile...